Complete bathroom fitting

Generally, a bathroom takes about two weeks to replace.

 

  • Rip out the existing bathroom and tiles

  • Update the plumbing where necessary

  • Move the heating pipes for a towel radiator

  • Fit new lighting and maybe an extractor fan

  • Repair and plaster walls and ceiling

  • Fit new bath and / or shower tray and tile above

  • Tile floor

  • Fit remaining suite

  • Dispose of all waste materials

 

Larger projects include removing internal (non-structural) walls e.g. converting a separate loo into the bathroom or removing a redundant airing cupboard.

Where the bath is becoming difficult to use it can be replaced with a walk-in shower the same size or bigger. Grab bars and shower seats can also be fitted if required.

Other services include replacing kitchen sinks and taps and general domestic wet plumbing